TOM WITHERSPOON, Ph. D., PE.
CONSULTING ENGINEER

1030 East Beltline
Richardson, TX 75081
(214) 202-5780
Office: (972) 235-3267
Fax: (972) 437-2286
tomw5@ix.netcom.com


This process requires drilling 2” holes through the slab or grade beam and then
injecting a soil/cement grout to fill voids, and by continuing this pressure injection
lifting the slab to a more acceptable position.